What changed at the registries
Every weekly read is compared with the last. Status flips, completion-date extensions and promoter changes are listed here as they are noticed; each project page keeps its own history.
- 5 Oct 2026Saubhagya Enclave Muzaffarpur, Bihar
promoter now Pansari Builders and Contractors Pvt Ltd - 5 Oct 2026Saubhagya Enclave Muzaffarpur, Bihar
completion date — → 30 Apr 2023 - 5 Oct 2026Vishwa Shanti Apartment Muzaffarpur, Bihar
promoter now HI-Tech Sanjay Construction Private Limited - 5 Oct 2026Vishwa Shanti Apartment Muzaffarpur, Bihar
completion date — → 20 Mar 2025 - 5 Oct 2026Adps Palace Gaya, Bihar
promoter now Vastu vastaya builder pvt ltd - 5 Oct 2026Adps Palace Gaya, Bihar
completion date — → 31 Dec 2026 - 5 Oct 2026Sanidhya Kunj Gaya, Bihar
promoter now Vastu vastaya builder pvt ltd - 5 Oct 2026Sanidhya Kunj Gaya, Bihar
completion date — → 28 Jun 2019 - 5 Oct 2026Kamta Prasad Residency Gaya, Bihar
promoter now Madehomes Developers Priavte Limited - 5 Oct 2026Kamta Prasad Residency Gaya, Bihar
completion date — → 15 Aug 2023 - 5 Oct 2026Veena Vatika Darbhanga, Bihar
promoter now KKT Constructions Private Limited - 5 Oct 2026Veena Vatika Darbhanga, Bihar
completion date — → 12 May 2027 - 5 Oct 2026Sunrise Exotica Residency Patna, Bihar
promoter now Sunrise Exotica Developers Pvt Ltd - 5 Oct 2026Sunrise Exotica Residency Patna, Bihar
completion date — → 31 Dec 2023 - 5 Oct 2026E-Homes Panorama Phase-II Purnea, Bihar
promoter now Simanchal Infratech Private Limited - 5 Oct 2026E-Homes Panorama Phase-II Purnea, Bihar
completion date — → 25 Jun 2026 - 5 Oct 2026E-Homes Panorama Purnea, Bihar
promoter now Simanchal Infratech Private Limited - 5 Oct 2026E-Homes Panorama Purnea, Bihar
completion date — → 31 Jan 2021 - 5 Oct 2026Munka Tradecomm Kishanganj, Bihar
promoter now Munka Tradecomm Private Limited - 5 Oct 2026Munka Tradecomm Kishanganj, Bihar
completion date — → 21 May 2029 - 5 Oct 2026Highway Residency Bihar
promoter now Satyamev Developcon Private Limited - 5 Oct 2026Highway Residency Bihar
completion date — → 31 Dec 2021 - 5 Oct 2026JAN Awasiya Yojana Bihar
promoter now Satyamev Developcon Private Limited - 5 Oct 2026JAN Awasiya Yojana Bihar
completion date — → 10 May 2021 - 5 Oct 2026Sri Ram Villa Gaya, Bihar
promoter now Prangan Developers Private Limited - 5 Oct 2026Sri Ram Villa Gaya, Bihar
completion date — → 26 Sept 2025 - 5 Oct 2026Pine AVL Heights Begusarai, Bihar
promoter now Pine Developers Private Limited - 5 Oct 2026Pine AVL Heights Begusarai, Bihar
completion date — → 16 Feb 2031 - 5 Oct 2026Kamla Binay Apartment Patna, Bihar
promoter now Chandra Sales Pvt Ltd - 5 Oct 2026Kamla Binay Apartment Patna, Bihar
completion date — → 1 Sept 2029 - 5 Oct 2026Debishree Tower Bhagalpur, Bihar
promoter now Mrug Developer LLP - 5 Oct 2026Debishree Tower Bhagalpur, Bihar
completion date — → 14 Apr 2030 - 5 Oct 2026Adyah Great City Bihar
promoter now Adyah Great City Privat Limited - 5 Oct 2026Adyah Great City Bihar
completion date — → 20 Dec 2024 - 5 Oct 2026Shiwangi Enclave Bihar
promoter now Bhaskar Singh - 5 Oct 2026Shiwangi Enclave Bihar
completion date — → 19 Mar 2027 - 5 Oct 2026Siddhivinayak Enclave Patna, Bihar
promoter now Mordernvilla Construction India PvtLtd - 5 Oct 2026Siddhivinayak Enclave Patna, Bihar
completion date — → 31 Dec 2021 - 5 Oct 2026Vastu Vihar Aurangabad PH-02 Aurangabad, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Aurangabad PH-02 Aurangabad, Bihar
completion date — → 22 Aug 2025 - 5 Oct 2026Vastu Vihar Muzaffarpur PH-02 EXT-03 Muzaffarpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Muzaffarpur PH-02 EXT-03 Muzaffarpur, Bihar
completion date — → 28 Jul 2025 - 5 Oct 2026Vastu Vihar ARA PH-03 Bhojpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar ARA PH-03 Bhojpur, Bihar
completion date — → 30 Apr 2025 - 5 Oct 2026Vastu Vihar Aiims -1 Project-6 Patna, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Aiims -1 Project-6 Patna, Bihar
completion date — → 30 Jun 2020 - 5 Oct 2026Vastu Vihar Saharsa PH-02 Saharasa, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Saharsa PH-02 Saharasa, Bihar
completion date — → 30 Jun 2024 - 5 Oct 2026Usha Ram Prawesh Complex Patna, Bihar
promoter now Shreeya Construction Pvt. Ltd. - 5 Oct 2026Usha Ram Prawesh Complex Patna, Bihar
completion date — → 21 Aug 2029 - 5 Oct 2026Dr. PARMATMA SINGH JASCON RESIDENCY Patna, Bihar
promoter now Jascon Enterbuild Limited - 5 Oct 2026Dr. PARMATMA SINGH JASCON RESIDENCY Patna, Bihar
completion date — → 20 Mar 2019 - 5 Oct 2026Swarn Kamal Plaza Bhagalpur, Bihar
promoter now Sahu Developers - 5 Oct 2026Swarn Kamal Plaza Bhagalpur, Bihar
completion date — → 22 May 2028 - 5 Oct 2026Sriniwas Villas Patna, Bihar
promoter now Sriniwas Realstructure Pvt Ltd - 5 Oct 2026Sriniwas Villas Patna, Bihar
completion date — → 4 Aug 2029 - 5 Oct 2026Universal Royal Residency Patna, Bihar
promoter now Universal Green Infra Ltd - 5 Oct 2026Universal Royal Residency Patna, Bihar
completion date — → 31 Dec 2022 - 5 Oct 2026Universal Ultima Patna, Bihar
promoter now Universal Green Infra Ltd - 5 Oct 2026Universal Ultima Patna, Bihar
completion date — → 31 Dec 2022 - 5 Oct 2026Universal Classic 2 Patna, Bihar
promoter now Universal Green Infra Ltd - 5 Oct 2026Universal Classic 2 Patna, Bihar
completion date — → 10 Sept 2023 - 5 Oct 2026Universal Classic 1 Patna, Bihar
promoter now Universal Green Infra Ltd - 5 Oct 2026Universal Classic 1 Patna, Bihar
completion date — → 15 May 2019 - 5 Oct 2026Universal Garden Patna, Bihar
promoter now Universal Green Infra Ltd - 5 Oct 2026Universal Garden Patna, Bihar
completion date — → 31 Dec 2022 - 5 Oct 2026GBN Patliputra Residency Patna, Bihar
promoter now Grih Bhoomi Nirman Pvt Ltd - 5 Oct 2026GBN Patliputra Residency Patna, Bihar
completion date — → 15 Mar 2024 - 5 Oct 2026GBN Shanti Satish Villa Patna, Bihar
promoter now Grih Bhoomi Nirman Pvt Ltd - 5 Oct 2026GBN Shanti Satish Villa Patna, Bihar
completion date — → 30 Jun 2023 - 5 Oct 2026GBN Skywalk Patna, Bihar
promoter now Grih Bhoomi Nirman Pvt Ltd - 5 Oct 2026GBN Skywalk Patna, Bihar
completion date — → 31 Mar 2026 - 5 Oct 2026GBN Aawas Patna, Bihar
promoter now Grih Bhoomi Nirman Pvt Ltd - 5 Oct 2026GBN Aawas Patna, Bihar
completion date — → 20 Apr 2025 - 5 Oct 2026GBN Empire Patna, Bihar
promoter now Grih Bhoomi Nirman Pvt Ltd - 5 Oct 2026GBN Empire Patna, Bihar
completion date — → 19 Dec 2023 - 5 Oct 2026Universal Business Park Patna, Bihar
promoter now Grih Bhoomi Nirman Pvt Ltd - 5 Oct 2026Universal Business Park Patna, Bihar
completion date — → 15 Nov 2023 - 5 Oct 2026Bindeshwary Apartment Patna, Bihar
promoter now Gyanti Buildcon Private Limited - 5 Oct 2026Bindeshwary Apartment Patna, Bihar
completion date — → 1 Jun 2020 - 5 Oct 2026Shri Sai Ashish Phase 1 Patna, Bihar
promoter now Aarthik Housing Limited - 5 Oct 2026Shri Sai Ashish Phase 1 Patna, Bihar
completion date — → 31 Mar 2025 - 5 Oct 2026Shiv Shyam Orchard Bihar
promoter now Apna Awas Construction PvtLtd. - 5 Oct 2026Shiv Shyam Orchard Bihar
completion date — → 20 Jul 2028 - 5 Oct 2026Nirmalya Patna, Bihar
promoter now Apna Awas Construction PvtLtd. - 5 Oct 2026Nirmalya Patna, Bihar
completion date — → 31 Jan 2025 - 5 Oct 2026Rajgharana Regency-Surya Sadan Darbhanga, Bihar
promoter now Rajgharana Associates Private Limited - 5 Oct 2026Rajgharana Regency-Surya Sadan Darbhanga, Bihar
completion date — → 1 Mar 2029 - 5 Oct 2026Shri Sai Village Patna, Bihar
promoter now Aarthik Housing Limited - 5 Oct 2026Shri Sai Village Patna, Bihar
completion date — → 30 Dec 2025 - 5 Oct 2026Kosmos Patna, Bihar
promoter now Apna Awas Construction PvtLtd. - 5 Oct 2026Kosmos Patna, Bihar
completion date — → 9 Aug 2029 - 5 Oct 2026Kirti Height Patna, Bihar
promoter now Kirti Sagar Construction Private Limited - 5 Oct 2026Kirti Height Patna, Bihar
completion date — → 31 Dec 2029 - 5 Oct 2026Shri Sai Ashish Phase 2 Patna, Bihar
promoter now Aarthik Housing Limited - 5 Oct 2026Shri Sai Ashish Phase 2 Patna, Bihar
completion date — → 31 Dec 2024 - 5 Oct 2026Akanksha Baidhynath Bhawan Patna, Bihar
promoter now Akanksha Construction Individual / - 5 Oct 2026Akanksha Baidhynath Bhawan Patna, Bihar
completion date — → 31 Dec 2024 - 5 Oct 2026Vastu Vihar Darbhanga PH-03 EXT-01 Darbhanga, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Darbhanga PH-03 EXT-01 Darbhanga, Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Sasaram PH-05 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Sasaram PH-05 Rohtas, Bihar
completion date — → 18 Oct 2025 - 5 Oct 2026Vastu Vihar Sasaram PH-05 EXT-01 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Sasaram PH-05 EXT-01 Rohtas, Bihar
completion date — → 20 Oct 2025 - 5 Oct 2026Vastu Vihar Purniya Phase 02 Extension 1 Purnea, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Purniya Phase 02 Extension 1 Purnea, Bihar
completion date — → 31 Aug 2025 - 5 Oct 2026Vastu Vihar Dehri PH 02 Extension 01 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Dehri PH 02 Extension 01 Rohtas, Bihar
completion date — → 30 Jul 2024 - 5 Oct 2026Vastu Vihar Muzaffarpur PH-02 EXT-01 Muzaffarpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Muzaffarpur PH-02 EXT-01 Muzaffarpur, Bihar
completion date — → 20 Aug 2025 - 5 Oct 2026Biharsharif Phase-02 Nalanda, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Biharsharif Phase-02 Nalanda, Bihar
completion date — → 9 May 2022 - 5 Oct 2026Vastu Vihar Muzaffarpur Phase-02 Muzaffarpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Muzaffarpur Phase-02 Muzaffarpur, Bihar
completion date — → 31 Oct 2021 - 5 Oct 2026Vastu Vihar Hajipur Phase 01 Extension 01 Vaishali, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Hajipur Phase 01 Extension 01 Vaishali, Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Hajipur Phase 02 Extension 01 Vaishali, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Hajipur Phase 02 Extension 01 Vaishali, Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Gaya Phase-6 Gaya, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Gaya Phase-6 Gaya, Bihar
completion date — → 31 May 2022 - 5 Oct 2026Vastu Vihar Arah Phase-01, Extension-01 Bhojpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Arah Phase-01, Extension-01 Bhojpur, Bihar
completion date — → 9 Oct 2021 - 5 Oct 2026Vastu Vihar Gaya Phase-03 Extension -2 Gaya, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Gaya Phase-03 Extension -2 Gaya, Bihar
completion date — → 31 Dec 2019 - 5 Oct 2026Vastu Vihar Dehri PH 01 Extension 01 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Dehri PH 01 Extension 01 Rohtas, Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Jehanabad PH 01 Jehanabad, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Jehanabad PH 01 Jehanabad, Bihar
completion date — → 3 Mar 2021 - 5 Oct 2026Vastu Vihar Begusarai PH 01 Extension 01 Begusarai, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Begusarai PH 01 Extension 01 Begusarai, Bihar
completion date — → 31 Dec 2024 - 5 Oct 2026Vastu Vihar Bhagalpur Phase 01 Extension 01 Bhagalpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Bhagalpur Phase 01 Extension 01 Bhagalpur, Bihar
completion date — → 30 Dec 2025 - 5 Oct 2026vastu vihar Samastipur phase 01 extension 01 Samastipur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026vastu vihar Samastipur phase 01 extension 01 Samastipur, Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Sasaram Phase 02 Extension 01 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Sasaram Phase 02 Extension 01 Rohtas, Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Chhapra Phase 01 Extension 01 Saran, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Chhapra Phase 01 Extension 01 Saran, Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Madhubani Phase 01 EXT 01 Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Madhubani Phase 01 EXT 01 Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Aurangabad Phase 01 Extension 01 Aurangabad, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Aurangabad Phase 01 Extension 01 Aurangabad, Bihar
completion date — → 30 Apr 2021 - 5 Oct 2026Vastu Vihar Patna Project-08 Patna, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Patna Project-08 Patna, Bihar
completion date — → 31 Oct 2021 - 5 Oct 2026Vastu Vihar Sasaram PH 04 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Sasaram PH 04 Rohtas, Bihar
completion date — → 30 May 2022 - 5 Oct 2026Vastu Vihar ARA PH-02 EXT-01 Bhojpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar ARA PH-02 EXT-01 Bhojpur, Bihar
completion date — → 30 Dec 2025 - 5 Oct 2026Vastu Vihar Sasaram PH-06 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Sasaram PH-06 Rohtas, Bihar
completion date — → 28 Oct 2025 - 5 Oct 2026Vastu Vihar Buxar PH-02 EXT-01 Buxar, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Buxar PH-02 EXT-01 Buxar, Bihar
completion date — → 10 Sept 2025 - 5 Oct 2026Vastu Vihar Samastipur PH-02 EXT-03 Samastipur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Samastipur PH-02 EXT-03 Samastipur, Bihar
completion date — → 6 Feb 2030 - 5 Oct 2026Vastu Vihar ARA PH-04 Bhojpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar ARA PH-04 Bhojpur, Bihar
completion date — → 8 Oct 2029 - 5 Oct 2026Vastu Vihar Buxar PH-03 Buxar, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Buxar PH-03 Buxar, Bihar
completion date — → 14 Sept 2029 - 5 Oct 2026Vastu Vihar Samastipur PH-02 EXT-01 Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Samastipur PH-02 EXT-01 Bihar
completion date — → 31 Mar 2028 - 5 Oct 2026Vastu Vihar ARA PH-03 EXT-01 Bhojpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar ARA PH-03 EXT-01 Bhojpur, Bihar
completion date — → 23 Sept 2025 - 5 Oct 2026Vastu Vihar Dehri-on-Sone PH-02 EXT-03 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Dehri-on-Sone PH-02 EXT-03 Rohtas, Bihar
completion date — → 18 Sept 2024 - 5 Oct 2026Vastu Vihar Darbhanga PH-02 EXT-02 Darbhanga, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Darbhanga PH-02 EXT-02 Darbhanga, Bihar
completion date — → 23 Jul 2029 - 5 Oct 2026Vastu Vihar Commercial Complex Chhapra Phase-02 Saran, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Commercial Complex Chhapra Phase-02 Saran, Bihar
completion date — → 30 Nov 2021 - 5 Oct 2026Vastu Vihar Gaya Phase-03 Extension-1 Gaya, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Gaya Phase-03 Extension-1 Gaya, Bihar
completion date — → 31 Aug 2022 - 5 Oct 2026Vastu Vihar Saharsa Phase 01 Saharasa, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Saharsa Phase 01 Saharasa, Bihar
completion date — → 10 Aug 2020 - 5 Oct 2026Vastu Vihar Aurangabad PH-03 Aurangabad, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Aurangabad PH-03 Aurangabad, Bihar
completion date — → 15 Apr 2024 - 5 Oct 2026Vastu Vihar Buxar PH-02 Buxar, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Buxar PH-02 Buxar, Bihar
completion date — → 30 Nov 2025 - 5 Oct 2026Vastu Vihar Dehri-on-Sone PH-02 EXT-02 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Dehri-on-Sone PH-02 EXT-02 Rohtas, Bihar
completion date — → 30 Sept 2025 - 5 Oct 2026Vastu Vihar Katihar PH-01ext-03 Katihar, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Katihar PH-01ext-03 Katihar, Bihar
completion date — → 30 Jan 2025 - 5 Oct 2026Vastu Vihar Muzaffarpur PH-02 EXT-02 Muzaffarpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Muzaffarpur PH-02 EXT-02 Muzaffarpur, Bihar
completion date — → 30 Nov 2024 - 5 Oct 2026V V Dehri-on-Sone PH-03 Rohtas, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026V V Dehri-on-Sone PH-03 Rohtas, Bihar
completion date — → 28 May 2029 - 5 Oct 2026V V Saharsa PH-02 EXT-01 Saharasa, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026V V Saharsa PH-02 EXT-01 Saharasa, Bihar
completion date — → 28 May 2029 - 5 Oct 2026Vastu Vihar Purnea PH-02 EXT-02 Purnea, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Purnea PH-02 EXT-02 Purnea, Bihar
completion date — → 16 Jan 2029 - 5 Oct 2026V V Motihari PH-03 East Champaran, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026V V Motihari PH-03 East Champaran, Bihar
completion date — → 18 Oct 2030 - 5 Oct 2026Vastu Vihar Katihar PH-02 Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Katihar PH-02 Bihar
completion date — → 28 Mar 2025 - 5 Oct 2026VASTU VIHAR KATIHAR PH-02 Ext-01 Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026VASTU VIHAR KATIHAR PH-02 Ext-01 Bihar
completion date — → 24 Mar 2026 - 5 Oct 2026Vastu Vihar Mobarakpur Patna Project 03 Patna, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Mobarakpur Patna Project 03 Patna, Bihar
completion date — → 28 Feb 2019 - 5 Oct 2026Vastu Vihar Aiims Project-7 Patna, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Aiims Project-7 Patna, Bihar
completion date — → 30 Oct 2020 - 5 Oct 2026Vastu Vihar Arah Phase 02 Bhojpur, Bihar
promoter now Technoculture Building Centre Private Limited - 5 Oct 2026Vastu Vihar Arah Phase 02 Bhojpur, Bihar
completion date — → 5 Oct 2024